Infrastructure
The Infrastructure Facelift in The Year 2020
The Science Block was installed with incinerator weighing 150 kg for the combustion of waste materials to ensure the safe disposal of wastes in an environmental healthy way. Renovations in the building were made with prefabricated façade and roof elements.Two washrooms were built in the primary block. Wonder den was refurbished with new equipments.


Infrastructure Thrust in The Year 2018-19
The management of the school is very keen to provide state of the art infrastructure in tune with the modern day demands
- Our School was provided with an incinerator in the Science Block.
- Two washrooms were built in the primary block.
- Wonder den was refurbished with new equipment.
- New books were purchased for the library.
- Renovations in the building with prefabricated façade and roof elements changed the architecture.
- The front office arena housing the Principal’s office, office room were given a face lift this year